We are thrilled to share with you our most recent and prestigious accomplishment. In 2024, we had the honor of working in Vatican City on the renewal of the protective glass in front of Michelangelo’s La Pietà. This remarkable project involved on-site supervision, field testing, and exceptional teamwork. We are proud to announce that the […]
Category Archives: Glass
Located in Parma, this school is characterized by glass curtain wall both on the classrooms perimeter and to the staircases. These facades are made of aluminum mullions and transoms with both fixed glass parts and doors and windows. MEW was commissioned by FI Metal Srl for technical assistance in static analysis. Situata in Parma, questa […]
Excited to share our latest completed project Glass and GFRC panel facade at 2440 Fulton Street, Brooklyn, NY! Facade combines high-strength glass and glass fiber reinforced concrete. This design optimizes both durability and aesthetics, contributing to Brooklyn’s evolving skyline. Curious about the details? Let’s connect! #architecture #GFRC #facadedesign #BrooklynNY #structuralengineering #2440Fulton
New Google Campus based in NYC will have its own amazing facade installed soon! Terrific job, engineered by #mew for AZA Corporation Take a look at the following article, written by New York Yimby Google’s Office at 550 Washington Street Nears Topping Out in Hudson Square
A whole day on site for an exciting test With hydraulic pistons, more than 60 Tons were applied to the steel structure of the new Gallery! #MEW #Canopy #SteelStructure #testing
Extension project of Montefiore SC is on its way up! Installation of steel canopy has just started Field testing of a part of the canopy will be performed soon! #MEW #Canopy #SteelStructure
PMU testing were performed on three different facades of the 550W project, based in New York City. Results obtained allow to move towards the next and final steps of the design! #MEW #AZAint #NYC #550W #Facade
Bridges installation close our job at Southbank Place Many thanks to the team which was amazing during the whole installation process! #MEW #London #Bridges #WaagnerBiro #PalinImages
Glazing envelope of the new Corporate Commons Three project has reached the top! Installation is almost completed. Engineering provided by MEW for ISA Spa Corporate Commons Three – New York – ISA project
Glazing envelope of the new Corporate Commons Three project is on its way up! Amazing view on construction site. Engineering provided by MEW for ISA Spa Corporate Commons Three – New York – ISA project